Gadang Engineering Sdn Bhd

Duration: April 2018 – August 2021

Project Mass Rapid Transit Laluan 2: Sungai Buloh – Serdang –Putrajaya(SSP)Package V 206-Construction and Completion of Viaduct Guideway and other Associated Works from Serdang Raya to UPM


Fajarbaru Builder Sdn Bhd

Duration: Aug 2016 – March 2020

Rehabilition of Track Formation replacement of Ballast and Associated Works between Jerantut,Pahangto Gua Musang Railway Station,Kelantan (Package B)


Dominant Energy Sdn Bhd

Duration: 2019 

Install Rail Track Bogie at BulkcargoJetty for MRCSB.


Unik Kukuh Sdn Bhd

Duration: 2019 

LRT – Installation of Scissor Crosser at Sultan Ismail Station.


Lion Pacific Sdn Bhd

Duration: Mar 2016 – January 2017

Projek Landasan Keretapi Dari Subang Jaya-Terminal SKYPARK (FASA 1).


Meccilect Sdn Bhd

Duration: Feb – Sept 2017

Steel fabrication works, installation and commissioning of pipe rack ELME at RAPID Pengerang project.


Colas Rail Asia Sdn Bhd

Duration: April – May 2016

Supply Manpower For Kelana Jaya Line Extension Project.


GSIB Sdn. Bhd.

Duration: June 2013 – August 2016

Labour Supply For East Residence, KLGCC – Rectification and Upgrading Works for Block G,H,I (39 units) for completion of balance of works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, Mukim Batu Dalam Kuala Lumpur.


AlloyMtd

Duration: April – Jul 2016

Specialist Surveyor to carry Out as built survey at KTMB Railway Tract related of 4th Lane widening at kuang Railway Bridge and Sungai Buloh Bridge Interchange.


Ikhmas Jaya Sdn Bhd

Duration: April 2016 – May 2016

Overall Roadways And Partial Structural Works For Parcel D for KL Eco City Sdn Bhd (Track Settlement Monitoring Work).


AlloyMtd

Duration: July 2014 – May 2015

Proposed Fourth lane Widening Between Sungai Buloh (KM457) and Rawang Interchange (KM443.90)-Package C.


Visi Nusajaya Sdn Bhd

Duration: June 2014 – June 2015

Labour Supply: Cleaning Work / Traffic Management / CCTV Works.


Multi Strategy Vision Enterprise

Duration: Jan – March 2015

Supply Labors and Tools To carry Out Welding Thermite Welding and Destressing Work and All Other Related Work As Per KTMB.


KTMB

Duration: April – June 2015

Destressing and Welding Works From Paloh to Kulai.


Emrail Sdn.Bhd.

Duration: June 2010 – Apr 2015

M370-Northern Double Tracking Project Between Ipoh and Padang Besar – Supply of Labour for Temporary Track Diversion.


Plus Order Sdn. Bhd.

Duration: Dec 2014 – Feb 2015

Provide Welders and Track Assistance To Carry Out Thermit Welding With The Provided Materials and Tools at Serendah Yard.


Unik Kukuh Sdn.Bhd.

Duration: June – Nov 2014

Design, Manufacture, Supply, Deliver, Assemble, Replace, test and Commission Of New 1:6 Shallow Depth Scissor Crossover at Sentul Timur Siding for Ampang Line


Ircon International Limited

Duration: Mar – August 2014

Supply of General Unskilled & Skilled workers on daily basis for maintenance of track machines and other miscellaneous works between Seremban – Gemas Section of SGEDT project.


Touch Tronics Rail And Services Sdn.Bhd.

Duration: Sept 2013 – May 2014

Construction And Completion Of Viaduct Guideway And Other Associated Works From Taman Mesra To Kajang Station – Extension and Rehabilitation of Track and Associated Work at Kajang (KTMB) Station ( Track Work ).


Balfour Beatty

Duration: Oct 2013 – April 2014

Electrified Double Track Project Between Ipoh And Padang Besar Systems- Provision of Manpower Supply for Termination Works


GJA-NBCT Rail JV

Duration: Apr – October 2014

Klang Valley Mass Rapid Transit Project Between Sg.Buloh To Kajang. (SBK-S-06-Trackworks). Package: Depot Trackworks.( To provide Light Weight Tie Tamper and Operator to carry out Tamping Work)


Touch Tronics Rail And Services Sdn.Bhd.

Duration: Aug 2013 – Feb2014

Construction And Completion Of Viaduct Guideway And Other Associated Works From Taman Mesra To Kajang Station – Supply of TMT and ERT Team For Extension And Rehabilitated Of Track And Associated Work At Kajang (KTMB) Station.


B & G Corporation Sdn Bhd

Duration: Jan – Feb 14

Provide Track Monitoring Team (TMT works) and Emergency response team (ERT) for Track monitoring 24 hours with three teams.


KTMB

Duration: July 2014 – Dec 2014

Proposed Rail Renewal And Associated Works From Batang Benar to Seremban in Central Region.


GTS Contractor Sdn Bhd

Duration: Oct-13

Supply And Installation of 6 Nos of Settlement Marker And Carry Out Track Monitoring Work (TMT WORKS)


Ircon International

Duration: Aug-13

Supply Of General workers On Daily Basis For Maintenance Of Existing Railway Track For Package 1: Cleaning of Cess, Boxing and Dressing of shoulder ballast between Sg.Gadut – Rembau.


Ircon International

Duration: Feb 2010 – Jul 2013

Work for Temporary/ Permanent Diversion between Seremban to Tampin CH461.234 to CH500.400:Electrified Double Track Project from Seremban to Gemas(Package A)


Ircon International

Duration: May 2011 – Jul 2013

Track Work for Main Line Track for Electrified Double Track in Tampin to Batang Melaka section from CH510800 to CH535500, Package B.


Ircon International

Duration: June – July 2013

Design, Construction,Completion, Testing, Commissioning and Maintenance of the Electrified Double Track Project between Seremban-Gemas: Construction of Approach Road and Other Related Works for Electrical Feeder Station at Batang Melaka.


Fabricontrol Const.(M) Sdn Bhd

Duration: May – Nov 2011

Design, Construction,Completion, Testing, Commissioning and Maintenance of the Electrified Double Track Project between Seremban-Gemas: Signalling, Trenching, cable Lying and Asscociated work Between Sg.Gadut and Rembau Station.


KTM Tanah Melayu Berhad.

Duration: April – Jun 2011

Track upgrading & Associated works at Plentong Station.


KTM Tanah Melayu Berhad.

Duration: April – Jun 2011

Extention of 3rd loop lines and associated works at KEMPAS bahru station.


Bombardier (M) Sdn.Bhd.

Duration: March – June 2010

To supply manpower for installation of Kelana Jaya mainline Optical Fibre Cable.


Ircon International Limited

Duration: Feb2009 – Feb2010

Design, Construction,Completion, Testing, Commissioning and Maintenance of the Electrified Double Track Project between Seremban-Gemas: Supply of general workers on daily basis for maintenance of existing railway track.


Unik Kukuh Sdn.Bhd.

Duration: Dec2009 – Jan2010

Proposed to install reinforcing beam to strengthen the both buffer stop of Star LRT Track at Ampang Station.


Emrail Sdn. Bhd.

Duration: June2009 – May2010

M370-Northern Double Tracking Project between Ipoh and Padang Besar – Supply of labours for Temporary Track Diversion.


AKS Sepakat Sdn. Bhd.

Duration: May2009 – Dec2009

Rehabilitation and strengthen of track and associated works between Seremban and Rembau Railway Station.


Kuala Freight Sdn. Bhd.

Duration: Oct2008 – Jan2009

Unloading & Stacking of rails at Seremban Yard (Double Track Gemas to Seremban ).


Hisniaga Sdn.Bhd.

Duration: Sept2008 – Feb2009

Provide labours, tools, transporation and accommodation to carry out track works at LRT Extension Line Subang.


AKS Sepakat Sdn. Bhd.

Duration: Nov2008 – April2009

Provide labours, tools, machinery to unload and dismantle recovered wooden track, sorting according to various grade and components and stacking at yard.(Rehabilitation & strengthening of Railway Track and associated from Seremban to Rembau Railway Station).


Emrail Sdn. Bhd.

Duration: Jan2009 – June2009

Double Tracking Work between Rawang to Ipoh (maintenance team)


MMC – Gamuda Joint Venture Sdn. Bhd

Duration: Jan2009 – June2009

Electrified Double Track Project between Ipoh – Padang Besar(Jarak Rail Storage Yard).


Hisniaga Sdn.Bhd.

Duration: Nov2008 – Feb2009

Rehabilitation and strengthen of track and associated works between Rembau to Gemas Railway Station.Track strengthening works at Station Main Line (Kendong, Tampin, Batang Melaka, Tebong and Air Kuning Station)


Emrail Sdn. Bhd.

Duration: Jan2008 – Dec2008

Double Tracking Work between Rawang to Ipoh (maintenance team)


Hisniaga Sdn.Bhd.

Duration: Aug – Dec2008

To provide labours, tools, transportation and accommodation to carry out Rail Stacking at Jarak Stock Yard for MMC-Gamuda Jv.


Ircon International Limited

Duration: Sept2008 – Nov2008

Design, Construction,Completion, Testing, Commissioning and Maintenance of the Electrified Double Track Project between Seremban-Gemas: Tender for Construction and Establishment of Rail Stacking Yard in existing Seremban Railway Yard.


Hisniaga Sdn.Bhd.

Duration: June2008 – Dec2008

Dismantling of recovered wooden sleeper panels stacked at various station yards, sorting according to various grade and component and stacking at the station yards.(Gemas to Tampin)


Hisniaga Sdn.Bhd.

Duration: Sept2008 – Dec2008

Track strengthening work between Railway Station Alor Star – Padang Besar.


Hisniaga Sdn.Bhd.

Duration: Sept2008 – Oct2008

Rehabilitation and strengthening of track and associated works between Rembau to Gemas Railway Station. Track strengthening works at Station Main Line (Kendong & Tampin)


Hisniaga Sdn.Bhd.

Duration: Aug – Dec2008

Spot renewal using 2,500 units of Grade “B” timber sleepers starting from Junun Railway Station.


Ircon International Limited

Duration: June – Aug2008

Installation of Office Cabin, Fencing and related works at Petaling Jaya Railway Station for storing documents.


KTMB

Duration: May2008 – Aug2008

Spot renewal of 1,600 units of timber sleepers on curves between railway stations Seremban – Rembau in Sounthern Region.


Lion Pacific Engineering Sdn.Bhd.

Duration: Nov2007 – Aug2008

Rehabilitation and strengthening of track and associated works between Bukit Merah and Taiping Railway Station – Destressing Works


Lion Pacific Engineering Sdn.Bhd.

Duration: Mar – May2008

Level Crossing, approach mud pumping and installation of Junction Rail.


Hisniaga Sdn.Bhd.

Duration: Mar2008 – May2008

Destressing works between Tampin to Batang Melaka


AKS Sepakat Sdn. Bhd.

Duration: Mar 2008 – Aug 2008

Rehabilitation and strengthening of track and associated works between Seremban and Rembau Railway Station


KTMB

Duration: Sept 2007 – Jan 2008

Jungle felling between SPK-P.Klang and SPK-Seremban.


Ircon International Limited

Duration: March – Jan 2008

Track Formation Rehabilitation Works at Mud Pumping, Bridge approach & station mainline between Bukit Mertajam and Parit Buntar.


Ircon International Limited

Duration: Jan 2007 – April 2008

Track Rehabilitation & Strengthening – Complete Track Renewal (CTR) Work with UIC 54kg rail, PSC sleeper & distressing between Parit Buntar – Bukit merah and Bukit Merah – Taiping Stations.


Ircon International Limited

Duration: July 2007 – Jan 2008

Construction of PQRS panel assembly & stockpile yard and other allied facilities at Taiping Station Yard.


Ircon International Limited

Duration: Feb2007 – Jan2008

Track rehabilitation & Strengthening – construction of Stockpile Yard, Panel Assembly & FB Welding Depot and other allied facilities at Parit Buntar Station Yard.


Ircon International Limited

Duration: Feb – Dec2007

Track Rehabilitation & Strengthening – Earthwork & Track work for raising and renewal of track by laying temporary diversion between Parit Buntar Bukit Merah and Bukit Merah-Taiping Stations.


Lion Pacific Engineering Sdn.Bhd.

Duration: March – June2007

Rehabilitation & strengthening of track and associated works between Bukit Merah and Taiping Railway Station – Drainage Works


Lion Pacific Engineering Sdn.Bhd.

Duration: Dec2006 – July2007

Track formation rehabilitation, mud pumping, bridge approach & station mainline works between Bukit Merah and Taiping Station.


Ircon International Limited

Duration: Nov2006 – Aug2007

Track formation rehabilition works at Mud Pumping, Bridge approach & station mainline between Parit Buntar and Bukit Merah Station.


Emrail Sdn. Bhd.

Duration: Jan – Dec2007

Double Tracking Work between Rawang to Ipoh (maintenance team)


KTMB

Duration: Oct – Dec2007

Track strengthening work (sleeper changing) between Railway Station Alor Star – P.Besar.


Emrail Sdn. Bhd.

Duration: Dec2005 – Dec2006

Double Tracking Work between Rawang to Ipoh (maintenance team).


KTMB

Duration: Nov2005 – Apr2006

Jungle felling between Rawang – K.Lumpur, Sentul-P.Klang and K.Lumpur-Seremban.


Jua Yakin Sdn. Bhd.

Duration: May 2006

Construction of Sewage Treatment Plant Project Phase 2 – P3C2 Kuala Sawah


KTMB

Duration: Oct – Dec2006

Track strengthening work (sleeper changing) between Railway Station Tampin.


Escade Construction Sdn. Bhd.

Duration: Apr – May2006

Rehabilitation of Track Formation and Associated Works between Tenang to Labis Railway Station, Johor.


Emrail Sdn. Bhd.

Duration: Oct2002 – Aug2005

Replacement of Ballast & Associated Works between Kerdau to Sg.Yu,Pahang.


Emrail Sdn. Bhd

Duration: Dec2004 – Nov2005

Double Tracking Work between Rawang to Ipoh (maintenance team)


Emrail Sdn. Bhd.

Duration: Oct2003 – Dec2004

Double Tracking Work between Rawang to Ipoh (maintenance team)


Emrail Sdn. Bhd.

Duration: Dec2002 – Dec2003

Double Tracking Work between Rawang to Ipoh (maintenance team)


Noble Diginity Sdn.Bhd.

Duration: April – Sept 2002

Upgrading of Track between Tampin – Gemas


Pretech Sdn.Bhd.

Duration: June – Dec2002

Upgrading of Track between Seremban – Tampin