Gadang Engineering Sdn Bhd
Duration: April 2018 – August 2021
Project Mass Rapid Transit Laluan 2: Sungai Buloh – Serdang –Putrajaya(SSP)Package V 206-Construction and Completion of Viaduct Guideway and other Associated Works from Serdang Raya to UPM
Fajarbaru Builder Sdn Bhd
Duration: Aug 2016 – March 2020Rehabilition of Track Formation replacement of Ballast and Associated Works between Jerantut,Pahangto Gua Musang Railway Station,Kelantan (Package B)
Dominant Energy Sdn Bhd
Duration: 2019Install Rail Track Bogie at BulkcargoJetty for MRCSB.
Unik Kukuh Sdn Bhd
Duration: 2019LRT – Installation of Scissor Crosser at Sultan Ismail Station.
Lion Pacific Sdn Bhd
Duration: Mar 2016 – January 2017Projek Landasan Keretapi Dari Subang Jaya-Terminal SKYPARK (FASA 1).
Meccilect Sdn Bhd
Duration: Feb – Sept 2017Steel fabrication works, installation and commissioning of pipe rack ELME at RAPID Pengerang project.
Colas Rail Asia Sdn Bhd
Duration: April – May 2016Supply Manpower For Kelana Jaya Line Extension Project.
GSIB Sdn. Bhd.
Duration: June 2013 – August 2016Labour Supply For East Residence, KLGCC – Rectification and Upgrading Works for Block G,H,I (39 units) for completion of balance of works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, Mukim Batu Dalam Kuala Lumpur.
AlloyMtd
Duration: April – Jul 2016Specialist Surveyor to carry Out as built survey at KTMB Railway Tract related of 4th Lane widening at kuang Railway Bridge and Sungai Buloh Bridge Interchange.
Ikhmas Jaya Sdn Bhd
Duration: April 2016 – May 2016Overall Roadways And Partial Structural Works For Parcel D for KL Eco City Sdn Bhd (Track Settlement Monitoring Work).
AlloyMtd
Duration: July 2014 – May 2015Proposed Fourth lane Widening Between Sungai Buloh (KM457) and Rawang Interchange (KM443.90)-Package C.
Visi Nusajaya Sdn Bhd
Duration: June 2014 – June 2015Labour Supply: Cleaning Work / Traffic Management / CCTV Works.
Multi Strategy Vision Enterprise
Duration: Jan – March 2015Supply Labors and Tools To carry Out Welding Thermite Welding and Destressing Work and All Other Related Work As Per KTMB.
KTMB
Duration: April – June 2015Destressing and Welding Works From Paloh to Kulai.
Emrail Sdn.Bhd.
Duration: June 2010 – Apr 2015M370-Northern Double Tracking Project Between Ipoh and Padang Besar – Supply of Labour for Temporary Track Diversion.
Plus Order Sdn. Bhd.
Duration: Dec 2014 – Feb 2015Provide Welders and Track Assistance To Carry Out Thermit Welding With The Provided Materials and Tools at Serendah Yard.
Unik Kukuh Sdn.Bhd.
Duration: June – Nov 2014Design, Manufacture, Supply, Deliver, Assemble, Replace, test and Commission Of New 1:6 Shallow Depth Scissor Crossover at Sentul Timur Siding for Ampang Line
Ircon International Limited
Duration: Mar – August 2014Supply of General Unskilled & Skilled workers on daily basis for maintenance of track machines and other miscellaneous works between Seremban – Gemas Section of SGEDT project.
Touch Tronics Rail And Services Sdn.Bhd.
Duration: Sept 2013 – May 2014Construction And Completion Of Viaduct Guideway And Other Associated Works From Taman Mesra To Kajang Station – Extension and Rehabilitation of Track and Associated Work at Kajang (KTMB) Station ( Track Work ).
Balfour Beatty
Duration: Oct 2013 – April 2014Electrified Double Track Project Between Ipoh And Padang Besar Systems- Provision of Manpower Supply for Termination Works
GJA-NBCT Rail JV
Duration: Apr – October 2014Klang Valley Mass Rapid Transit Project Between Sg.Buloh To Kajang. (SBK-S-06-Trackworks). Package: Depot Trackworks.( To provide Light Weight Tie Tamper and Operator to carry out Tamping Work)
Touch Tronics Rail And Services Sdn.Bhd.
Duration: Aug 2013 – Feb2014Construction And Completion Of Viaduct Guideway And Other Associated Works From Taman Mesra To Kajang Station – Supply of TMT and ERT Team For Extension And Rehabilitated Of Track And Associated Work At Kajang (KTMB) Station.
B & G Corporation Sdn Bhd
Duration: Jan – Feb 14Provide Track Monitoring Team (TMT works) and Emergency response team (ERT) for Track monitoring 24 hours with three teams.
KTMB
Duration: July 2014 – Dec 2014Proposed Rail Renewal And Associated Works From Batang Benar to Seremban in Central Region.
GTS Contractor Sdn Bhd
Duration: Oct-13Supply And Installation of 6 Nos of Settlement Marker And Carry Out Track Monitoring Work (TMT WORKS)
Ircon International
Duration: Aug-13Supply Of General workers On Daily Basis For Maintenance Of Existing Railway Track For Package 1: Cleaning of Cess, Boxing and Dressing of shoulder ballast between Sg.Gadut – Rembau.
Ircon International
Duration: Feb 2010 – Jul 2013Work for Temporary/ Permanent Diversion between Seremban to Tampin CH461.234 to CH500.400:Electrified Double Track Project from Seremban to Gemas(Package A)
Ircon International
Duration: May 2011 – Jul 2013Track Work for Main Line Track for Electrified Double Track in Tampin to Batang Melaka section from CH510800 to CH535500, Package B.
Ircon International
Duration: June – July 2013Design, Construction,Completion, Testing, Commissioning and Maintenance of the Electrified Double Track Project between Seremban-Gemas: Construction of Approach Road and Other Related Works for Electrical Feeder Station at Batang Melaka.
Fabricontrol Const.(M) Sdn Bhd
Duration: May – Nov 2011Design, Construction,Completion, Testing, Commissioning and Maintenance of the Electrified Double Track Project between Seremban-Gemas: Signalling, Trenching, cable Lying and Asscociated work Between Sg.Gadut and Rembau Station.
KTM Tanah Melayu Berhad.
Duration: April – Jun 2011Track upgrading & Associated works at Plentong Station.
KTM Tanah Melayu Berhad.
Duration: April – Jun 2011Extention of 3rd loop lines and associated works at KEMPAS bahru station.
Bombardier (M) Sdn.Bhd.
Duration: March – June 2010To supply manpower for installation of Kelana Jaya mainline Optical Fibre Cable.
Ircon International Limited
Duration: Feb2009 – Feb2010Design, Construction,Completion, Testing, Commissioning and Maintenance of the Electrified Double Track Project between Seremban-Gemas: Supply of general workers on daily basis for maintenance of existing railway track.
Unik Kukuh Sdn.Bhd.
Duration: Dec2009 – Jan2010Proposed to install reinforcing beam to strengthen the both buffer stop of Star LRT Track at Ampang Station.
Emrail Sdn. Bhd.
Duration: June2009 – May2010M370-Northern Double Tracking Project between Ipoh and Padang Besar – Supply of labours for Temporary Track Diversion.
AKS Sepakat Sdn. Bhd.
Duration: May2009 – Dec2009Rehabilitation and strengthen of track and associated works between Seremban and Rembau Railway Station.
Kuala Freight Sdn. Bhd.
Duration: Oct2008 – Jan2009Unloading & Stacking of rails at Seremban Yard (Double Track Gemas to Seremban ).
Hisniaga Sdn.Bhd.
Duration: Sept2008 – Feb2009Provide labours, tools, transporation and accommodation to carry out track works at LRT Extension Line Subang.
AKS Sepakat Sdn. Bhd.
Duration: Nov2008 – April2009Provide labours, tools, machinery to unload and dismantle recovered wooden track, sorting according to various grade and components and stacking at yard.(Rehabilitation & strengthening of Railway Track and associated from Seremban to Rembau Railway Station).
Emrail Sdn. Bhd.
Duration: Jan2009 – June2009Double Tracking Work between Rawang to Ipoh (maintenance team)
MMC – Gamuda Joint Venture Sdn. Bhd
Duration: Jan2009 – June2009Electrified Double Track Project between Ipoh – Padang Besar(Jarak Rail Storage Yard).
Hisniaga Sdn.Bhd.
Duration: Nov2008 – Feb2009Rehabilitation and strengthen of track and associated works between Rembau to Gemas Railway Station.Track strengthening works at Station Main Line (Kendong, Tampin, Batang Melaka, Tebong and Air Kuning Station)
Emrail Sdn. Bhd.
Duration: Jan2008 – Dec2008Double Tracking Work between Rawang to Ipoh (maintenance team)
Hisniaga Sdn.Bhd.
Duration: Aug – Dec2008To provide labours, tools, transportation and accommodation to carry out Rail Stacking at Jarak Stock Yard for MMC-Gamuda Jv.
Ircon International Limited
Duration: Sept2008 – Nov2008Design, Construction,Completion, Testing, Commissioning and Maintenance of the Electrified Double Track Project between Seremban-Gemas: Tender for Construction and Establishment of Rail Stacking Yard in existing Seremban Railway Yard.
Hisniaga Sdn.Bhd.
Duration: June2008 – Dec2008Dismantling of recovered wooden sleeper panels stacked at various station yards, sorting according to various grade and component and stacking at the station yards.(Gemas to Tampin)
Hisniaga Sdn.Bhd.
Duration: Sept2008 – Dec2008Track strengthening work between Railway Station Alor Star – Padang Besar.
Hisniaga Sdn.Bhd.
Duration: Sept2008 – Oct2008Rehabilitation and strengthening of track and associated works between Rembau to Gemas Railway Station. Track strengthening works at Station Main Line (Kendong & Tampin)
Hisniaga Sdn.Bhd.
Duration: Aug – Dec2008Spot renewal using 2,500 units of Grade “B” timber sleepers starting from Junun Railway Station.
Ircon International Limited
Duration: June – Aug2008Installation of Office Cabin, Fencing and related works at Petaling Jaya Railway Station for storing documents.
KTMB
Duration: May2008 – Aug2008Spot renewal of 1,600 units of timber sleepers on curves between railway stations Seremban – Rembau in Sounthern Region.
Lion Pacific Engineering Sdn.Bhd.
Duration: Nov2007 – Aug2008Rehabilitation and strengthening of track and associated works between Bukit Merah and Taiping Railway Station – Destressing Works
Lion Pacific Engineering Sdn.Bhd.
Duration: Mar – May2008Level Crossing, approach mud pumping and installation of Junction Rail.
Hisniaga Sdn.Bhd.
Duration: Mar2008 – May2008Destressing works between Tampin to Batang Melaka
AKS Sepakat Sdn. Bhd.
Duration: Mar 2008 – Aug 2008Rehabilitation and strengthening of track and associated works between Seremban and Rembau Railway Station
KTMB
Duration: Sept 2007 – Jan 2008Jungle felling between SPK-P.Klang and SPK-Seremban.
Ircon International Limited
Duration: March – Jan 2008Track Formation Rehabilitation Works at Mud Pumping, Bridge approach & station mainline between Bukit Mertajam and Parit Buntar.
Ircon International Limited
Duration: Jan 2007 – April 2008Track Rehabilitation & Strengthening – Complete Track Renewal (CTR) Work with UIC 54kg rail, PSC sleeper & distressing between Parit Buntar – Bukit merah and Bukit Merah – Taiping Stations.
Ircon International Limited
Duration: July 2007 – Jan 2008Construction of PQRS panel assembly & stockpile yard and other allied facilities at Taiping Station Yard.
Ircon International Limited
Duration: Feb2007 – Jan2008Track rehabilitation & Strengthening – construction of Stockpile Yard, Panel Assembly & FB Welding Depot and other allied facilities at Parit Buntar Station Yard.
Ircon International Limited
Duration: Feb – Dec2007Track Rehabilitation & Strengthening – Earthwork & Track work for raising and renewal of track by laying temporary diversion between Parit Buntar Bukit Merah and Bukit Merah-Taiping Stations.
Lion Pacific Engineering Sdn.Bhd.
Duration: March – June2007Rehabilitation & strengthening of track and associated works between Bukit Merah and Taiping Railway Station – Drainage Works
Lion Pacific Engineering Sdn.Bhd.
Duration: Dec2006 – July2007Track formation rehabilitation, mud pumping, bridge approach & station mainline works between Bukit Merah and Taiping Station.
Ircon International Limited
Duration: Nov2006 – Aug2007Track formation rehabilition works at Mud Pumping, Bridge approach & station mainline between Parit Buntar and Bukit Merah Station.
Emrail Sdn. Bhd.
Duration: Jan – Dec2007Double Tracking Work between Rawang to Ipoh (maintenance team)
KTMB
Duration: Oct – Dec2007Track strengthening work (sleeper changing) between Railway Station Alor Star – P.Besar.
Emrail Sdn. Bhd.
Duration: Dec2005 – Dec2006Double Tracking Work between Rawang to Ipoh (maintenance team).
KTMB
Duration: Nov2005 – Apr2006Jungle felling between Rawang – K.Lumpur, Sentul-P.Klang and K.Lumpur-Seremban.
Jua Yakin Sdn. Bhd.
Duration: May 2006Construction of Sewage Treatment Plant Project Phase 2 – P3C2 Kuala Sawah
KTMB
Duration: Oct – Dec2006Track strengthening work (sleeper changing) between Railway Station Tampin.
Escade Construction Sdn. Bhd.
Duration: Apr – May2006Rehabilitation of Track Formation and Associated Works between Tenang to Labis Railway Station, Johor.
Emrail Sdn. Bhd.
Duration: Oct2002 – Aug2005Replacement of Ballast & Associated Works between Kerdau to Sg.Yu,Pahang.
Emrail Sdn. Bhd
Duration: Dec2004 – Nov2005Double Tracking Work between Rawang to Ipoh (maintenance team)
Emrail Sdn. Bhd.
Duration: Oct2003 – Dec2004Double Tracking Work between Rawang to Ipoh (maintenance team)
Emrail Sdn. Bhd.
Duration: Dec2002 – Dec2003Double Tracking Work between Rawang to Ipoh (maintenance team)
Noble Diginity Sdn.Bhd.
Duration: April – Sept 2002Upgrading of Track between Tampin – Gemas
Pretech Sdn.Bhd.
Duration: June – Dec2002Upgrading of Track between Seremban – Tampin